HOME | DD

Kethaera — Importing and Using .obj Files by-nc-nd

Published: 2008-12-08 06:29:58 +0000 UTC; Views: 7118; Favourites: 65; Downloads: 518
Redirect to original
Description Importing and Using .obj Files in DAZ Studio

Dedicated to ~Lillyanna-Windmane , whose staunch support has helped me believe in myself.

The Equalizer sword .obj model used in this tutorial can be found at [link] .

Other credits:
Arick for M4 by LA3D
Valiant outfit by DAZ with textures by Chohole
Kozaburo Wave Hair

You may link to, download, share, display, and redistribute this tutorial as long as my copyright signature is not removed or altered nor any other part of the image altered, save for resizing, and you abide by the terms of the CCL.
Related content
Comments: 4

john-reilly [2011-08-20 22:20:55 +0000 UTC]

Just scanning through your tutorials and spotted the sword, time passes so quickly when you're having fun. I made that sword in 2008 - hopefully my modeling skills have got better since then

👍: 0 ⏩: 0

shadowbob19 [2011-06-12 23:59:50 +0000 UTC]

great tutorial really helpful

👍: 0 ⏩: 0

Lillyanna-Windmane [2008-12-08 16:36:29 +0000 UTC]

Ohh! this is great! I never knew how to do that!
I'll try it later this afternoon.

👍: 0 ⏩: 0

dazclub [2008-12-08 10:45:58 +0000 UTC]

This is a great tutorial. Thank you

👍: 0 ⏩: 0